Services

Our services

Installation of Rebar Anchors

Anchor bars are normally inserted before the pouring of the foundation.

Learn more

Installation of the Panels

Thanks to their lightweight, a single operator can easily lift and place panels where required.

Learn more

Post Installation

Immediately after the placement of the panels, the perfect linearity and verticality of the walls is checked and ensured.

Learn more

Installation of the Floor Panels

Once the floor panels are placed, supported by the walls and from below, any necessary additional steel reinforcement is installed and the concrete is poured.

Learn more

Preparation for Electrical and Plumbing

A hot-air gun or torch is used to create channels in the polystyrene for the placement of switch boxes, electrical conduits, cables, pipes, etc.

Learn more

Application of Shotcrete

Both sides of the walls of the Single Panel are sprayed with shotcrete and subsequently plaster.

Learn more